Multiple tasks within 7 days

From compartmentalized to open-plan—all while the clients were on holiday! 

We love a project with a deadline, and this one was a 7-day race against the clock while the family was away on vacation!

What we achieved in 7 days:
1. Wall Removal: Knocked down the wall between the kitchen and dining room to create one expansive, open-plan space.
2. Living Room Access: Sealed up the old archway, created a new entrance, and fitted a stylish glass door to flood the room with natural light.
3. Lighting & Electrics: Installed 11 LED spotlights and completely re-routed major electrical cables that previously ran through the removed stud wall.
4. Stunning Flooring: Laid "Waterside Oak Parquet" in a classic Herringbone pattern throughout the new space.
5. Heating Upgrade: Removed two smaller radiators, installed a large high-capacity radiator to warm the new open-plan layout, and added a fresh radiator in the hallway—with all pipework safely concealed inside the walls.

(Note: Kitchen fitting was retained as-is per the client's request!)

The ultimate "Welcome Home" surprise. Handed back on time, clean, and ready to enjoy. 🔑✨
[email protected]
0161-960-0182
6 Ashbourne Avenue, Middleton, 
Manchester, UK
M24 2NZ
Visit our FacebookVisit our Instagram
Copyright © Opal Construction 2020
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram