Chimney breast removal

We had to have structural engineers calcs made for this to allow for the floor above which breast had support prior to removal. Steel and bolts done the job.
[email protected]
0161-960-0182
6 Ashbourne Avenue, Middleton, 
Manchester, UK
M24 2NZ
Visit our FacebookVisit our InstagramVisit our Twitter
Copyright © Opal Construction 2020
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram