Chimney breast removal
This has been a massive week for structural work on this project! We've been busy creating open, modern spaces and solidifying the existing structure. Here's a breakdown of the key elements...
This has been a massive week for structural work on this project! We've been busy creating open, modern spaces and solidifying the existing structure. Here's a breakdown of the key elements...
Busy week for us working on a 1930's End Terrace in Middleton. The ceiling was uneven, we couldn't board over it, so in the kitchen we framed AND boarded, in the living room we battoned over existing ceiling. All boarded ready for plastering. Smooth as a baby's......
We knocked the plaster off the walls back to brick, renewed the electrics in the room, and installed a new window at the bottom. The chimney was left exposed for character. We raked out and repointed the brickwork, followed by an acid clean for a crisp finish...
Small chimney breast took out today creating space in a small room.
We've supported chimney above with brackets and plate to structural engineers report.
Floor made good and ceiling ready for over board.